MC Earthmoving have been undertaking large scale earthmoving and infrastructure works on the 180Ha Portlink Industrial Estate in Lyndhurst. They have specialist knowledge and the equipment to deal with challenging site conditions. They also have the resources to complete works on time.

I have found their quality of work to be of a very high standard and would highly recommend MC Earthmoving for small to large scale civil infrastructure projects.
— Theo Liakopoulos Director – Dalton Consulting Engineers (DCE)

Lyndhurst Inland Port

stage 1, 2 & 3 bulk earthworks

MC Earthmoving successfully completed Stage 1 and Stage 2 of this major project in 2013 and 2014 and is now continuing on to Stage 3. The major transport hub will ultimately link the industrial development in the south-east of Melbourne to the proposed new deep water port on Westernport Bay, hence alleviating pressure on the Port of Melbourne and ensuring the future of Melbourne as a major player in world trade.

Our  operational philosophy revolves around the adequate planning of each project our team is involved with. Plans and drawings are carefully reviewed by our surveyors taking into account the project’s specific terrain and conditions.  

A practical working relationship is established with the client and consulting engineers, the overriding objective being to produce a quality product, at an affordable price, in a determined timescale. As required, a competent pool of subcontractors is called upon, and all personnel are committed to the maintenance of MC Earthmoving’s high standards in quality and safety.