Objectives
MC Earthmoving was contracted for the Bulk Earthworks component of the Kingston Links Golf Course residential redevelopment. Completing Stage 1 of the bulk earthworks in just over one year, MC Earthmoving excavated all previously placed material back to the existing natural ground, then conditioned, replaced and compacted to level 1 requirements.
More than 400,000 m3 of material was removed, conditioned and re-compacted to form the base earthworks for which the civil component will be constructed. Imported materials were concurrently placed to elevate the site to its designed level to meet the Melbourne water flood requirements.