Water Storage Dam, Mt Buller

Location
VIC
Duration
6 Months
Project Type
Water Storage Dam

Objectives

MC Earthmoving was contracted by principal contractor Entracon to construct a 100-megalitre water storage facility at Mt Buller in the Victorian Alps commencing in October of 2019, with the earthworks completed by February 2020. 

The project consisted of constructing a zoned embankment from material excavated from within the dam footprint. Arduous testing and sorting of suitable material was required to enable the fill structure to be constructed to meet all the filling criteria.

From establishing large pieces of earthmoving equipment to the extremely variable weather conditions and a very compressed construction window. The earthworks component of the construction was completed meeting all requirements that were specified.

Technology Integration

Everything you need for your next development or public works project offered by one contractor.

GPS technology


GPS technology results in a more efficient and accurate operation. 


Drone technology

To assist in surveying and gathering real-time project information.

Operations Software

For streamlined communication and business optimisation. 